Millipore's Waterline newsletter contains all the latest news and views on laboratory water purification technologies
Millipore's Waterline newsletter contains all the latest news and views on laboratory water purification technologies. Issue 10 discusses possible design configurations, key considerations and regulatory standards for larger volume installations, up to an entire laboratory building.
The design and installation of a total lab water purification system requires consideration of a wide range of factors, including the water quality and volume required, budget constraints, regulatory standards and the building architecture.
The project therefore requires real partnerships between the various professionals involved.
The regular care and maintenance of the system once the installation is complete must also be considered.
This edition of Waterline covers these aspects in more detail and case studies are given to demonstrate how the implementation of these projects works in practice.

